Rituals Live Event - Hilton Hotel, Warsaw.
900 m², 180 people, two stages.
Part one—training and presentation. Stage, P1.5 LED screen, two 85" TVs, sound system, and lighting. Assembly time? 4 hours, 10 people. Done.
The evening portion was being built alongside the event, simultaneously. A second stage, a second LED screen, a wall with a bathtub constructed of beMatrix, floor panels, and appropriate lighting—a ready-made photo opportunity. Special plexiglass walls with illuminated air bubbles. Flowers, greenery, a water ambiance. Cabaret. Evening lighting and sound.
To change the room from day to evening mode - 3 hours.
Several dozen square meters of LED screens in total.
Ideas were developed in collaboration with the client, on an ongoing basis. The result? Everyone was very pleased.
The next event is in October


